autostrada-douro-interior

Douro Interior Motorway (242 de km) – Portugal

Consultant: AFAPLAN ENGINERRING
Client: ASCENDI
Investment value: 600 000000 EUR
Execution period: May 2009 – December 2012

In the period May 2009 – December 2012 Afaplan conducted surveillance of construction works for the Douro Interior motorway in Portugal, located between Celorico da Beira and Miranda do Douro, totaling 242 km in length. The motorway contains 251 engineering structures, among which noteworthy due to impressive size re three bridges, 30 viaducts and two tunnels. The most complex structure of the Douro Interior highway is the bridge over the River Tua, which has a length of 500 m and 100 m height from deck to the river. Other features: 12 million square meters of deforestation, 20 million square meters of excavation and earthmoving, 3.7 million square meters of paving, 4.8 million square meters of crops and 100,000 cubic metres of concrete.