{"id":322,"date":"2014-12-09T14:04:19","date_gmt":"2014-12-09T14:04:19","guid":{"rendered":"http:\/\/en.aric.org.ro\/?p=322"},"modified":"2015-01-08T12:32:47","modified_gmt":"2015-01-08T12:32:47","slug":"322","status":"publish","type":"post","link":"https:\/\/en.aric.org.ro\/?p=322","title":{"rendered":""},"content":{"rendered":"<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-324\" src=\"http:\/\/en.aric.org.ro\/wp-content\/uploads\/2014\/12\/search-logoj-deva.jpg\" alt=\"search-logoj-deva\" width=\"624\" height=\"350\" data-id=\"324\" srcset=\"https:\/\/en.aric.org.ro\/wp-content\/uploads\/2014\/12\/search-logoj-deva.jpg 624w, https:\/\/en.aric.org.ro\/wp-content\/uploads\/2014\/12\/search-logoj-deva-300x168.jpg 300w\" sizes=\"(max-width: 624px) 100vw, 624px\" \/><\/p>\n<p><strong>Lugoj \u2013 Deva Motorway, lot 1 (km 0+000 \u2013 km 27+400)<\/strong><\/p>\n<p>Consultant: SEARCH CORPORATION<br \/>\nClient: CNADNR<br \/>\nInvestment value: 279,773,129 EUR<br \/>\nExecution Period: 2011 \u20132013<\/p>\n<p>Lugoj-Deva highway construction project, part of the Pan-European Transport Corridor no. IV, was promoted under Priority Axis 1 &#8220;Modernization and development of TEN-T in order to develop a sustainable transport system integrated with EU transport networks&#8221; major intervation 1 &#8220;Modernization and development of road infrastructure along the TEN-T 7 &#8220;.<br \/>\nSearch Corporation has provided services of supervision of the execution of Lugoj \u2013 Deva motorway, lot 1, located in parts of the west of the country, in Banat area, being included in the administrative territory of Timi\u015f county, and having a total length of 27,620 km. The engineering works included in the project are: 116 culverts, 27 bridges and overpasses, 4 nodes and traffic volumes of works included: 9 million m3 earthworks, road surface structure of 1.1 million m2, gullies and ditches ml 205 million, 200 million mL fences.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lugoj \u2013 Deva Motorway, lot 1 (km 0+000 \u2013 km 27+400) Consultant: SEARCH CORPORATION Client: CNADNR Investment value: 279,773,129 EUR Execution Period: 2011 \u20132013 Lugoj-Deva highway construction project, part of the Pan-European Transport Corridor&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=\/wp\/v2\/posts\/322"}],"collection":[{"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=322"}],"version-history":[{"count":8,"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=\/wp\/v2\/posts\/322\/revisions"}],"predecessor-version":[{"id":572,"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=\/wp\/v2\/posts\/322\/revisions\/572"}],"wp:attachment":[{"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.aric.org.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}